At New York State Solar Farm we aim to make the process of going solar as easy as possible for you. We handle every aspect of your solar installation, from system design and engineering, to obtaining financing, to the engineered blueprints needed for your building permit, to actually filing for and obtaining your building permit, to filing for your NYSERDA grant, interconnecting the system with your utility and scheduling all necessary inspections… we’ve got you covered so that any legwork on your part is minimized to just signing needed documents along the way.
A more in depth version of our typical timeline is shown below:
1 - Say YES to Going Green!
2 - Complete application for loan or lease approval, & welcome call.
3 - E-Sign NYSSF Agreement & Utility Interconnection Paperwork via Adobe Sign.
4 - Schedule Technical Home Analysis (THA).
The THA is a 1.5-2 hour assessment of your home to ensure all structural & electrical components can support your solar system. We will also measure your roofs & the sun access they receive via drone to confirm everything in your Agreement, or if an Amendment is needed. An adult will need to be present for the THA, & we will need access to the interior of your home to inspect your attic & electric panel.